|
Meeting Date:
|
|
Category:
|
APPROVAL OF CONSENT AGENDA |
|
|
Type:
|
|
Subject:
|
For Action: VDOT Easements - Walton Middle School |
|
|
ACPS Division Objective :
|
Goal 3 Equitable, Transformative Resources
|
|
|
Enclosure:
|
Enclosure 1: VDOT Letter Enclosure 2: VDOT Perpetual Easement Enclosure 3: Century Link Easement Enclosure 4: Dominion Easement Enclosure 5: Drawings |
|
|
File Attachment:
|
|
Summary:
|
The Virginia Department of Transportation (VDOT) is in the process of acquiring rights of way for the repair and maintenance of the bridge on Route 708 near Walton Middle School. A portion of ACPS property is needed for a realignment of utilities (CenturyLink and Dominion) adjacent to the bridge. The easements include a VDOT perpetual easement, temporary construction easement, and permanent utility easements for CenturyLink and Dominion. The easement areas are at the edge of the property and do not impact school operations. |
|
|
Funding:
|
VDOT is offering $2,300 for the perpetual easement. |
|
|
Recommendation
|
This is for information only. At a later meeting, Building Services Department staff will recommend that the documents be approved and signed. |
|
|
Approvals:
|
Recommended By: |
Signed By: |
 |
Lindsay Snoddy - Director of Building Services |
|
Signed By: |
|
Rosalyn Schmitt - Chief Operating Officer |
|
Signed By: |
|
Dr. Matthew Haas - Superintendent |
|
|
|
|
|
|
|