Meeting Date:
|
8/25/2022 - 6:30 PM
|
Category:
|
APPROVAL OF CONSENT AGENDA
|
Type:
|
Action
|
Subject:
|
For Action: VDOT Easements - Walton Middle School
|
ACPS Division Objective :
|
Goal 3 Equitable, Transformative Resources
|
Enclosure:
|
Enclosure 1: VDOT Letter Enclosure 2: VDOT Perpetual Easement Enclosure 3: Century Link Easement Enclosure 4: Dominion Easement Enclosure 5: Drawings
|
File Attachment:
|
|
Summary:
|
The Virginia Department of Transportation (VDOT) is in the process of acquiring rights of way for the repair and maintenance of the bridge on Route 708 near Walton Middle School. A portion of ACPS property is needed for a realignment of utilities (CenturyLink and Dominion) adjacent to the bridge. The easements include a VDOT perpetual easement, temporary construction easement, and permanent utility easements for CenturyLink and Dominion. The easement areas are at the edge of the property and do not impact school operations.
|
Funding:
|
VDOT is offering $2,300 for the perpetual easement.
|
Recommendation:
|
This is for information only. At a later meeting, Building Services Department staff will recommend that the documents be approved and signed.
|
Approvals:
|
Recommended By:
|
Signed By:
|
|
Lindsay Snoddy - Director of Building Services
|
|
Signed By:
|
|
Rosalyn Schmitt - Chief Operating Officer
|
|
Signed By:
|
|
Dr. Matthew Haas - Superintendent
|
|
|
|
|
|
|
|