Agenda Item
Meeting Date:
1/25/2024 - 5:30 PM  
Category:
SCHOOL DIVISION WORK SESSION  
Type:
Info  
Subject:
AHS Second Floor Connector Project, Schematic Design - L. Snoddy (7:25-7:40)  
ACPS Division Objective :
Goal 1
Thriving Students
Goal 2
Affirming and Empowering Communities
Goal 3
Equitable, Transformative Resources
 
Policy:
FEA - Facility Design  
Enclosure:
 
File Attachment:
AHS 2nd Connector SD.pdf
 
Summary:
Through the AHS and WAHS High School Master Plan completed in 2022, a high priority for AHS was determined to be a second floor connector wing to improve circulation and provide additional innovative spaces. The second floor connector will improve circulation throughout the building, add classroom capacity, and provide improved teacher professional space. The project concept involves a 1,500 square foot renovation inside the existing building with a 6,295 square foot addition/expansion that includes 6 additional classrooms, and ad additional space dedicated to teachers.  
Funding:
Funding for design services for the project is included in the FY24 CIP budget.  
Recommendation
Receive the AHS Second Floor Connector Schematic Design for information. Approval will be requested at the February 8th meeting.  
Approvals:
Recommended By:
Signed By:
Lindsay Snoddy - Director of Building Services
Signed By:  
Rosalyn Schmitt - Chief Operating Officer
Signed By:  
Dr. Matthew Haas - Superintendent