|
Meeting Date:
|
|
Category:
|
APPROVAL OF CONSENT AGENDA |
|
|
Type:
|
|
Subject:
|
AHS Second Floor Connector Project, Design Development |
|
|
ACPS Division Objective :
|
Goal 1 Thriving Students Goal 2 Affirming and Empowering Communities Goal 3 Equitable, Transformative Resources
|
|
|
Enclosure:
|
AHS 2nd Floor Connector - Design Development |
|
|
File Attachment:
|
|
Summary:
|
Through the AHS and WAHS High School Master Plan completed in 2022, a high priority for AHS was determined to be a second floor connector wing to improve circulation and provide additional innovative spaces. The second floor connector will improve circulation throughout the building, add classroom capacity, and provide improved teacher professional space. The project concept involves a 1,500 square foot renovation inside the existing building with a 6,295 square foot addition/expansion that includes 6 additional classrooms, and ad additional space dedicated to teachers. The schematic design was approved by the Board on February 8, 2024. The attached summary highlights the current design development plans and updates since the schematic design was presented. |
|
|
Funding:
|
Funding for design services for the project is included in the FY24 CIP budget. High School Renovation funding is being used for construction funding. |
|
|
Recommendation
|
Recommend approval of the design development plans and authorize staff to proceed with construction documents for bidding. |
|
|
Approvals:
|
Recommended By: |
Signed By: |
|
Lindsay Snoddy - Director of Building Services |
|
Signed By: |
|
Rosalyn Schmitt - Chief Operating Officer |
|
Signed By: |
|
Dr. Matthew Haas - Superintendent |
|
|
|
|
|
|
|